From: Charles Simenstad  (by way of
restech@sdsioa.ucsd.edu (Resident Techs of SIO))
Subject: Sproul's CRETM-LMER schedule update
Content-Length: 3297
Status: RO

The following is a REVISED cruise schedule for the May CRETM-LMER cruise,
which reflects the realities of what the Sproul crew is willing to do
(and the unrealities of the scientists), the need to mount the ADCP after
the initial up-river leg, and the imposition of a 30-hr neap series at
Buoy 39:

1995 CRETM-LMER II Cruise Schedule:

May  5         Personnel arrive Astoria
     6         Sproul arrives Astoria, likely late afternoon;
                docks at COE dock
               Loading, COE dock
May  7         Continue loading
          1200 Depart COE dock for RM53 (Beaver Dock)
               Tie-up Beaver Dock
     8    0000 Start "CREU11" 30-hr series at Beaver Dock
     9    0600 End "CREU11" 30-hr series at Beaver Dock
               Depart Beaver Dock for COE dock
               Tie-up COE dock
               Install ADCP mount on Sproul
          1800 Depart COE dock for Buoy 39
          1900 Anchor Buoy 39
     10   0000 Start "CREN11" 30-hr series at Buoy 39
     11   0600 End "CREN11" 30-hr series at Buoy 39
          0800 Depart Buoy 39 for North Channel station
          1000 Anchor North Channel station
     11   1200 Start "CREL11" 216-hr series at North Channel station
     12                            "
     13                            "
     14                            "
     15                            "
     16                            "
     17                            "
     18                            "
     19                            "
     20   1200 End "CREL11" 216-hr series
               Depart North Channel for COE dock
          1400 Tie-up COE dock; all hands off for next 27 hr
     21   1700 All hands due back on; new personnel = Sam Bledsoe,
                UC-Davis, replacing Denise Reed?
          1800 Depart COE dock for Clatsop Spit station
               Anchor Clatsop Spit station
     22   0000 Start "CRED11" 30-hr series at Clatsop Spit
                station
     23   0600 End "CRED11" 30-hr series at Clatsop Spit station
          0600 Up anchor, move to RM53, Beaver Dock
               Tie-up Beaver Dock
          1200 Start "CREU21" 30-hr series at Beaver Dock
     24   1800 End "CREU21" 30-hr series at Beaver Dock
               Depart Beaver Dock for Buoy-39 station
               Anchor Buoy 39 station
     25   0000 Start "CRES11" 30-hr series at Buoy 39 station
     26   0600 End "CRES11" 30-hr series at Buoy 39 station
               Depart Buoy 39 station for COE dock
               Tie-up COE dock
               offload, deinstall, etc.
               party
May  27        Sproul departs COE dock for LaJolla
               home

NOTE! Items STILL requiring response:

1.Who/how many wants hotel arrangements in Astoria for the
  night of the 5th? Only David has responded!
2.I recommend that everyone stay overnight on May 26 after
  having just finished a 30-hr series, unloaded the Sproul and
  had a dock party; Sproul people can stay aboard.
3.Jeff has sent out SCRIPPS medical history, alcohol/illegal
  drug, etc. forms for EVERYONE that might be on the Sproul to
  fill out.  This means EVERYONE!, even if you have filled out
  these before.  I am still expecting them by April 14!
4.John and Larry, I still need the completed SIO radioisotope use forms
  returned!







Internet: shipsked@ucsd.edu