Cruise Plan
>[sent 8 April]
>Captain Louis and Seth-

>We plan to load the Sproul on Wednesday afternoon, for both cruises.  Woody
>will be taking care of the setup/loading of the MOCNESS.
>
>CRUISE 1, the equipment test cruise, leaves 0800 Friday and returns by 0700
>Saturday.  We will be testing an autonomous profiling vehicle (APV) and a
>GPS drifter.  We will need to have a small boat on board (e.g., Boston
>Whaler-like vessel), for recovery of the APV.
>    Charlie Coughran just contacted me this a.m. about piggy-backing on this
>cruise, to deploy a concrete anchor 1/4 mile from the SIO pier.  I told him
>that I have no problem with this, but he will have to do it early Saturday
>morning (probably 2-4 a.m. or so), after we are through with other things.
>He may need help deploying this from the trawl wire on the A-frame.
>
>
>CRUISE 2, the student training cruise, leaves 0800 Saturday and returns by
>0800 Sunday.  We will use a MOCNESS (noon deployment, midnight deployment),
>a plankton pump system, bongo net, and neuston net.  We will deploy the
>MOCNESS from the 0.322 conducting wire, the plankton pump hose lowered over
>the side by hand, the bongo net from the A-frame with the hydrowire, and the
>neuston net from the the daybrook crane using the hydrowire.
>    So we will need at least 2 sheaves on the A-frame:  1 for the 0.322 wire
>and one for the hydrowire.  If Charlie Coughran's operation takes place, I
>guess he will need a 3rd sheave, to lower his concrete anchor (roughly 4 ft.
>diameter, 2 ft. high) from the A-frame.
>   We will also need a sheave for the daybrook crane, to hold the neuston
>net (a Manta net).
>   Seth-  the science party, including Woody but not you, totals 13 for this
>cruise.  Are there accommodations for you too?
>
>Let me know if you have questions.
>Mark Ohman
>
>++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++



 **************************         ODF       *****************************
 **************************  CRUISE REQUEST   *****************************
                             --------------
 PI/REQUESTOR: Dr. M. Ohman         EXPEDITION NAME: 9604SP.ohman
                                    INDEX:  UC SHIP FUNDS SIO271
                                             ODF USE STS1165(Ohman)
 DEPT: MLRG                         PHONE:   x42754 
                                    E-MAIL:  mohman@UCSD  
 VESSEL:  SPROUL                    TIC:     Woody Sutherland 
                                             
 DATES:     13 April 1996 to  13 April 1996
 LOADING:  11 April 1996
 PORTS:     San Diego     to  San Diego          
 __________________________________________________________________________
 PERSONNEL REQUIRED: No: 1    ** MT/SRA:          ET: 1        DATA/PROG:  
 __________________________________________________________________________
 Casts: 
        1 Use day
         
 Equipment Required:
       Single 1m sq. MOCNESS with 10 333-um nets and cod ends, flow meter
       At least one spare net, spare cod ends
       Extra spare parts: connectors, harnesses, etc.
       Electronics matching (ROMs etc.)
       Mocness Sensor
       Power Supply
       Cables
       Computer Equipment:
        PC
        VCR
        VCR Tapes
        Panasonic Printer
        Underwater Unit
        Deck Unit

      1 fluorometer
      1 transmissometer (Check if this is needed. Inform next users (CALCOFI)
                        that it will not be available until the 14th of April).
 ____________________________________________________________________________
 Additional Information:
 Loading 11 April 1996
 See email message of 3 April 1996 to Woody.
 Logistics and particulars have been discussed by Woody and Dr. Ohman and
 may not be included in this Request.
 __________________________________________________________________________
 Taken by:Ship Schedule,15 March 96 Request by:K.Sanborn, 8 April 1996
 Copies to: Sutherland/Wilson(Admin), Schmitt(ET), Mattson(ET),
 Long(Logistics), Doug Masten (CALCOFI), Mark Ohman 
 Resident Technicians (restech@sdsioa.ucsd.edu),
 Ship Scheduling (shipsked@ucsd.edu)
 STS participants: Woody Sutherland
** Notify K. Sanborn or Woody Sutherland of additions or changes.
   internet: ksanborn@ucsd.edu  Telephone: (619) 534-1903
             woodys@odf.ucsd.edu           (619) 534-4425

***********************************************************************************

Date: Tue, 2 Apr 96 13:38:22 PST
X-Sender: mohman@coast.ucsd.edu (Unverified)
Mime-Version: 1.0
To: sylvia@sio.ucsd.edu (Sylvia McDonald)
From: mohman@ucsd.edu (Mark D. Ohman)
Subject: Re: cruise plan
Cc: leastman@ucsd.edu

Cruise 1:  APV test  (0800 12 April - 0800 13 April)

Personnel:
   Mark Ohman,  Associate Professor, Chief Scientist
   David Jacobs, Assistant Research Oceanographer
   Kim McCoy, SIO staff volunteer
   Andrew Juhl, graduate student
   Alex DeRobertis, graduate student
   Glen Claxton, SIO staff volunteer
   Kevin Tinsley, SIO laboratory assistant

Purpose:    Test of Autonomous Profiling Vehicle  

Operating area:  SD Trough.  32 d. 40' N to 33 d. 10' N, 
                                                 117 d. 20' W to 118 d. 0' W

   Only light equipment (CTD and APV) will enter the water.


 ...........................................................................
.....................
Cruise 2:  Student training cruise   (0800 13 April - 0800 14 April)

Personnel:
  Mark Ohman,  Associate Professor, Chief Scientist
  Annie Townsend, Museum Scientist
  Woody Sutherland, STS Manager
  Amy Bridgeman, graduate student
  Adrian Costa, graduate student
  Jana Davis, graduate student
  Alex DeRobertis, graduate student
  Wendy Enright, graduate student
  Michael Graham, graduate student
  Andrew Juhl, graduate student
  Ginger Rebstock, graduate student
  Amy Shankle, graduate student
  unnamed,  graduate student
  unnamed,  graduate student


Purpose:  Student training in zooplankton sampling techniques (for SIO 271).

Operating area:  SD Trough.  32 d. 40' N to 33 d. 10' N, 
                                                 117 d. 20' W to 118 d. 0' W
   (same as cruise #1)


  A 1 m^2 MOCNESS will sample to 500 m.  Bongo deployments will be done to
300 m.  Plankton pumping will be done to 50 m.  Neuston sampling will be
done at the surface.  


 ...........................................................................
..................

My class met yesterday for the first time and it was impossible to provide
names of participants until now.

Internet: shipsked@ucsd.edu
WWW: http://sio.ucsd.edu/