DATE DOCUMENTS SENT
10/09/96 Check-off list
3/21/97 approved Radioisotopes Forms
2/20/97 Pre-cruise letter w/forms
3/11/97 Chief Scientist letter
3/28/97 Post-cruise letter w/forms
N/A Foreign clearance package
Prospectus: 1997 CalCOFI Cruises
I. Target Dates: Acceptable Dates (Start -- Finish)
10 - 25 January 2 January 25 February 10 - 25 April 1 April 25 May 10 - 25 July 1 July 25 August 10 - 25 October 1 October 25 November
II. 1997 Tentative Cruise Dates and Ships
1. 29 January - 17 February Jordan (20 days) 2. 4 - 23 April New Horizon (20 days) 3. 1 - 20 July Jordan (20 days) 4. 26 September - 15 October New Horizon (20 days)
III. Cruise Notes:
February 1997 (29 January - 17 February)
RV Jordan: 13 Bunks (15 possible in special circumstances)
9 CalCOFI Technicians: 4 MLR, 5 NMFS, 1 ODF Chemist
Cooperative Programs:
Veit (Birds) 1 Bunk 0 Days Shiptime 0 Vans/Winches
Mitchell 2 0 1 Van 1 Winch
Egg Sampling Pump
Note: This cruise is planned to be scheduled in coordination with a RV Jordan cruise. Please inform MLR if changes in schedule are being considered.
RV New Horizon: 19 Bunks (we prefer not to use more than 17)
10 CalCOFI Technicians (4 MLR, 5 NMFS, 1 ODF Chemist, 3 NMFS + 2 for egg sampling pump)
Cooperative Programs:
Veit (Birds) 1 Bunk 0 Days Shiptime 0 Vans/Winches Mitchell 2 0 1 Van 1 Winch Goericke 2 1 1 Van Zafiriou 1 1 Ruttenberg 1 0 0 Hayward/Emerson 2 0 0 Egg Sampling Pump 1 Van
RV Jordan: 13 Bunks (15 possible in special circumstances)
9 CalCOFI Technicians: (4 MLR, 4 NMFS, 1 ODF Chemist)
Veit (Birds) 1 Bunk 0 Days Shiptime 0 Vans/Winches Mitchell 2 0 1 Van 1 Winch
RV New Horizon
9 CalCOFI Technicians (4 MLR, 3 NMFS, 1 ODF Chemist)
Cooperative Programs:
Veit (Birds) 1 Bunk 0 Days Shiptime 0 Vans/Winches Mitchell 2 0 1 Van 1 Winch Goericke 2 1 1 Van
CTD winch 1000 m 0.322 wire for 24-place 10-l CTD/Rosette system + spare slip rings hydro winch 1000 m for bongo net tows and secchi casts portable CTD winch with ‘short’ wire for Mitchell bio-optical measurements room on ship for 3 or 4 vans (CalCOFI, Mitchell, Goericke, egg sampling pump) ventilated work space in aft lab ADCP (Chereskin) CalCOFI underway data logging system (continuous uncontaminated sea water to after lab) continuous sea water to cool incubators isotopes will be used by (potentially): CalCOFI, Mitchell, Goericke, Palenik, Zafiriou (when aboard) MLR will coordinate making sure that each program gets the necessary SIO approval vans (CalCOFI; Mitchell; Goericke; egg sampling pump)
Normally CalCOFI will not require a SIO resident technician, although special needs may lead us to request one (e.g., we requested one when we started the multicoring program).
Cruises: Ship Cooperative programs (days) January JD April NH Zafiriou (1 funded NSF) Mitchell (1 plan to request ONR/NASA?) Goericke (1 plan to request ONR) July JD October NH Mitchell (1 plan to request ONR/NASA?) Goericke (1 plan to request ONR) Palenik (1 pending NSF)