DATE SENT

DOCUMENTS SENT

1/31/97

Check-off list

9/17/97

Pre-cruise letter w/forms

10/14/97

Radioisotope form

9/24/97

Chief Scientist letter

10/31/97

Post-cruise letter w/forms

4/25/97 received/approved

10/10/97 Mexican clearance received/approved

Foreign clearance package*


Date: Fri, 12 Sep 1997 08:41:32 -0700
From: kris@odf.UCSD.EDU (Kristin Sanborn)
To: restech@sdsioa.ucsd.edu, john@odf.UCSD.EDU, jas@odf.UCSD.EDU
Subject: Equipment Request - New Horizon Montoya
Cc: kris@odf.UCSD.EDU, woodys@odf.UCSD.EDU, erika@odf.UCSD.EDU,
        joanne@odf.UCSD.EDU, bob@odf.UCSD.EDU, ron@odf.UCSD.EDU,
        doug@odf.UCSD.EDU, frank@odf.UCSD.EDU, dlong@odf.UCSD.EDU,
        carl@odf.UCSD.EDU, jswift@odf.UCSD.EDU, shipsked@ucsd.edu
X-Sun-Charset: US-ASCII
 
**************************         ODF       *****************************
************************** EQUIPMENT REQUEST *****************************
                            --------------
PI/REQUESTOR: Tammy Koonce, ResTech        EXPEDITION NAME: 9710NH.montoya
              for Dr. Montoya Expedition
PHONE:        4-1632                INDEX: ODF USE STS1165(Restechs/Montoya)
E-MAIL: restechs@sdsioa.ucsd.edu
VESSEL: New Horizon        TIC: John Boaz, Jim Schmitt (Staging only)
DATES:     20 Oct 1997 to  20 Nov 1997
PORTS:     San Diego  to Manazillo 
       Ship returns to San Diego 26 December 1997
__________________________________________________________________________
ODF PERSONNEL REQUIRED: No: 0    ** MT/SRA:     ET:          DATA/PROG:
__________________________________________________________________________
Equipment Required:
________________________________________________________________________
24 place Rosette Frame, coated 
       (Tammy Koonce, ResTech, contacted to verify that painted is acceptable)
 
24 each  Bottles 10-liter 
?? each  Bottles, spares 10-liter
        (CONTACT Tammy Koonce, ResTech to find out how many bottles)
 
1 each Seabird CTD system #A:
            CTD		9+		91878		6800M
            Press		Digiquartz	67248
	    Primary Sensors
		Temp		SBE 3plus	02359
		Cond		SBE 4C		01919
		O2		SBE 13-02-B	130471
		Pump		SBE 5T		xxx
	    Secondary Sensors
		Temp		SBE 3-01/F	867
		Cond		SBE 4-02/O	509
		Pump2		SBE 5T		140
 
1 each Deck unit 11plus 111878
1 each Pylon
1 each Transmissometer #521
1 each Fluorometer
1 each Altimeter, Simrad
__________________________________________________________________________
Additional Information:
PLEASE HAVE ALL CONTACT WITH PI GO THROUGH TAMMY KOONCE.
Deck Unit has a surface PAR interface.
T. Koonce to inform requestor STS does not have a PAR sensor.
 
Shipping Details (Approx.Dates,etc.):  Equipment needs to be on the MELVILLE
for an expedition 29 December 1997 to 5 January 1998.
The MELVILLE will be in Acapulco on 11 December 1997.
Restechs are making shipping arrangements from New Horizon to Melville.
Restech has requested a "break-down" box for shipping.
 
All equipment is to be returned clean and assembled.
Overboard equipment must be rinsed with fresh water and dried.
__________________________________________________________________________
Taken by: W. Sutherland              Request by: K. Sanborn, 21 August 1997
Copies to: Sutherland/Wilson/Digre(Administration),
	   RTW/Patrick (Calibrations), Boaz(Marine Tech), 
	   Masten(Chemistry), Delahoyde(Computers), Long(Logistics),
	   Mattson/Schmitt(Electronics), Swift(Science),
	   Resident Technicians (restech@sdsioa.ucsd.edu),
	   Ship Scheduling (shipsked@ucsd.edu)
ODF participants: None
** Notify Kristin Sanborn, John Boaz, Jim Schmitt of additions or changes.
internet: ksanborn@ucsd.edu      Telephone: (619) 534-1903