Date: Mon, 4 May 98 11:37:04 EDT
To: unols@gsosun1.gso.uri.edu, wilkesg@navo.navy.mil, shipsked@ucsd.edu,
jonesf@ucs.orst.edu
Subject: WILKES, NAVAL OCEANOGRAPHIC OFFICE
From: unols@gsosun1.gso.uri.edu
Mime-Version: 1.0
UNOLS Ship Time Request Form
-------------------------------------------------------------------------------
UNOLS Request ID #: 19980504113703
Version #: 001
Valid as of: 05/04/98 11:37 AM EDT
-------------------------------------------------------------------------------
P.I. Name Last: WILKES First: GORDON MI.: E.
Institution NAVAL OCEANOGRAPHIC OFFICE Will this project require a
Address: 1002 BALCH BLVD research vessel or special
STENNIS SPACE CTR, MS 39522 platform? Y
Phone Number: 228 688-4376 Ancillary Only
Fax Number: 228 688-4078 X Principal Use of Ship
E-mail: wilkesg@navo.navy.mil Large Program Name: None
-------------------------------------------------------------------------------
Proposal Title: NW COAST PHYS O
Research Purpose of Cruise: Area of Operations (Codes):
Physical Oceanography NP 9
New Proposal? N Amount requested: Geographic Description (Lat, Long):
Renewal? N Beginning: 45.5N/124W
Inst. Proposal #: Start date: Ending: 48.5N/125W
Proposal #: End Date: Technician Required (CTD, SCS, MCS, etc):
CTD, ADCP, CORES, XBT
Proposal Grant #: Agency Submitted To: Is any part of the project
within another country's EEZ? N
-------------------------------------------------------------------------------
Year Ship(s) Requested # of Science Optimum Dates Alternate Dates
(Name or Size) Days Required
1998 New Horizon 15 JUL-AUG NONE
-------------------------------------------------------------------------------
Total Ship Days Needed: Transit: 4 Science: 15 Port: 0
Proposed Ports: OPEN
Start Port: Intermediate: End Port:
-------------------------------------------------------------------------------
Number in Scientific Party: 1 Special Equipment Required: Yes
Please see comments at end of Form.
-------------------------------------------------------------------------------
Other Scientists Involved in Multi-P.I. Program:
Name: Institution: Name: Institution:
-------------------------------------------------------------------------------
SCUBA Diving? No Designate Lead Institution:
# Individual dives: # Divers onboard:
-------------------------------------------------------------------------------
Have you read the RVOC Safety Training Manual - Chapter 1 ? Yes
-------------------------------------------------------------------------------
Special Science Party Considerations:
Foreign Nationals Medical Conditions Disabled Persons
-------------------------------------------------------------------------------
Use of Hazardous Materials? No (List type, quantity, and disposal plans)
Radioactive:
Explosives:
Other:
-------------------------------------------------------------------------------
Equipment to be used:
Winches: Wire: Conductor Navigation: Communication:
Dredge/Trawl Mechanical 0.680" X GPS X Inmarsat
Hydro X 9/16" 0.322" DGPS ATS
X CTD 1/2" 0.255" Loran X FAX
Capstans 1/4" Single Dynamic Positioning Cellular
Multi Other SEANET
-------------------------------------------------------------------------------
Vans:
Refrigerated Nets:
Pingers Magazine Dip net
X Gravity Corers Isotope Isolation Plankton
Piston Corers Lab Neuston
Box Corers Storage Bongo
Rock Dredges Berthing Mid-water trawl
Airgun/watergun system MOCNESS (Size)
Explosive Handling Chest Freezers
Gear X Refrigerators Work boats
Thermometers Auto Analyzer Computer/peripherals
X CTD X Salinometer X PC computers
Rosette Sys. Nutrients SAIL system
Niskin bottles Oxygen titration X Digital XBT
-Size: Liquid Scintillation X ADCP
and number: Counter Gravimeter
Uncontaminated seawater IMET
intake
-------------------------------------------------------------------------------
Other Special Equipment - Comments:
This request is for work similar to that currently being conducted on New Horizon.
It provides oceanography during the summer season in the area of interest and takes
advantage of an opening in New Horizon's schedule. This will be additional to the
scheduled processing by SIO and will require a SIO technician on board.
This should be considered in costing out the cruise.