Date: Wed, 17 Jun 1998 11:15:52 -0700 (PDT) From: Paul HarveyReply-To: Paul Harvey To: Louis Zimm , Marine Facilities Shop , resident technicians , shipsked@ucsd.edu, rknox@ucsd.edu Cc: wpawelak@ucsd.edu, mms-field@coast.ucsd.edu, Clinton Winant , "Myrl C. Hendershott" , Ed Dever , Brynn Craffey , Erika Lawson , "Brett N. Lesh" , John Lyons , Jerome Wanetick , Dan Larsen , Charles Coughran , Jennifer Davis Subject: Cruise Plan - MMS #17 (fwd) Mime-Version: 1.0 ******************* Please Note: 1. This cruise will have two legs: Leg 1 24 June - 30 June, SD - Port Avila, Avila Beach 12 scientists + 1 res tech Leg 2 30 June - 3 July, Port Avila, Avila Beach to SD 10 scientists + 1 res tech 2. Chief Scientist Leg 1 - Clinton Winant Chief Scientist Leg 2 - Ed Dever 3. No port facilities are required at Avila Beach. CCS personnel have arranged and paid for the water taxi service at Avila Beach to facilitate transfer of personnel. 4. Gear will arrive on two 40' flatbed loads @ MarFac on tuesday 23 June. 5. Contacts Scientific: Clinton Winant cwinant@ ucsd.edu x42067 Ed Dever dever@coast.ucsd.edu x48091 Operations: Paul Harvey pharvey@ucsd.edu x44540 ******************** ---------- Forwarded message ---------- Date: Tue, 26 May 1998 15:58:36 -0700 (PDT) From: Clinton Winant To: pjh@coast.ucsd.edu, dever@coast.ucsd.edu, erika@coast.ucsd.edu, mch@coast.ucsd.edu Cc: brynn@coast.ucsd.edu Subject: Cruise Plan Oooops! MMS Cruise 17 R/V Sproul 24 June - 3 July 1998 Cruise Goals This is a mooring ops and survey cruise focused on the area between Port Hueneme and Port San Luis, CA. The plan calls for evening departure on 24 June. If this is not possible, plan will be revised. Diving ops may be required in the event of mooring failure. Leg 1 SD - Avila Beach Leg 2 Avila Beach - SD mooring acronyms: AB = Avila Beach AN = Anacapa Island AR = Pt. Arguello CA = Carpinteria GO = Goleta Pt. IN = inshore MB = Morro Bay MI = middle OF = offshore RO = Santa Rosa Island SA = Pt Sal SM = San Miguel Island 24 June 2000 leave Nimitz Marfac, transit to ANMI 25 June 1200 Deploy and Recover ANMI 1600 Depart for SMOF 26 June 0600 Deploy and Recover SMOF 0900 Begin SMOF-SMIN CTD line 1700 Deploy and Recover SMIN 2400 Depart for AROF 27 June 0600 Deploy and Recover AROF 1000 Depart for ARMI 1300 Deploy and Recover ARMI 1700 Depart for ARIN 1900 Deploy and Recover ARIN 28 June 0600 Deploy and Recover SAOF 1000 Depart for SAMI 1300 Deploy and Recover SAMI 1700 Depart for SAIN 1900 Deploy and Recover SAIN 29 June 0600 Deploy and Recover ABOF 1000 Depart for ABMI 1300 Deploy and Recover ABMI 1700 Depart for ABIN 1900 Deploy and Recover ABIN 30 June 0600 Catch up any unfinished mooring work 1200 Exchange personnel in Avila Beach 1800 Leave for SAIN 2100 Begin SAIN-SAOF CTD line 1 July 0500 End CTD line steam to ABOF 0800 Begin ADCP/XBT survey 2 July 2300 End ADCP/XBT survey at ANOF 2330 Begin ANIN-ANOF CTD line 3 July 0300 End CTD line. Depart for MARFAC 1800 Tie-up MARFAC Personnel Leg 1 Leg 2 1 Winant ** 2 Hendershott ** 3 Dever Dever 4 Harvey Harvey 5 Alden Alden 6 Crosby Crosby 7 keif keif 8 Jackson Jackson 9 Lyons Lawson 10 Aim Aim 11 skip Lesh 12 jss jss restech restech ******** Sproul Loading List during 23-24 June for MMS Cruise #17 during 25 June - 3 July 1998. The Sproul is due in on monday morning and should be available for loading of computers, underway mets, and survey gear on tuesday 23 June. The crane loading will take place on tuesday and wednesday, 23-24 June as required. We will send the mooring and other gear requiring crane loading to MarFac on tuesday in two loads of a 40' flat bed truck. Offloading in San Diego will take less than one day. ITEM Size (h x w x l, feet) Wt (lbs) Total Weight 5 surface buoys 6x5x5 1600 8,000 4 anchors 3x4x4 2800 11,200 5 buoy towers 9x2x2 200 1,000 3 chain baskets 3x4x4 2800 8,400 1 rigging basket 3x4x4 2000 2,000 1 drifter basket 4x4x5 900 900 1 wire rope pallet 3x4x8 2200 2,200 2 wire rope spoolers 4x4x5 800 1,600 1 instrument seavan 7x7x8 5500 5,500 1 seavan 8x8x20 12000 12,000 Total Weight 52,800 lbs. Loading and Prep on tuesday, 23 June Install and test underway/over-the-side restech ADCP Install and test underway met systems Set up data acquisition computers and systems in dry and wet labs (met, CTD, XBT, ADCP, general computers, micromariner, printers, cell tel) Loading and Prep with help from ResTech Group and MarFac Personnel on tuesday/wednesday 23-24 June Load scientific gear on deck Hang trawl block in A-frame center, stopper chain in A-frame port side (1/2" x 23' chain, CCS to provide) Load trash drum onto trawl winch w/ 200-500' of 9/16" 3x19 terminated working wire Set up deck capstan Provide CTD winch and set up with wire/slip rings for Neil Brown CTDs CCS Personnel Install towers, Argos, and lanterns on buoys Install top VMCMs to Buoy Argos for satellite data test Check out VMCMs, PSensors, TLoggers, kcells Tie down deck gear and gear in lab spaces