Date: Tue, 11 Aug 1998 10:58:51 -0700 (PDT) From: Paul HarveyTo: Louis Zimm , Marine Facilities Shop , resident technicians , shipsked@ucsd.edu, rknox@ucsd.edu Cc: Clinton Winant , wpawelek@ucsd.edu Subject: Sproul MMS cruise Mime-Version: 1.0 Proposed MMS Cruise for the Sproul, 3 days in August 1998. (18-21 August) Cruise Goals Deploy a mooring at the ABOF location in the MMS array. This location is in 350m of water approximately 12 miles off Avila Beach. Diving may be required in the event of a mooring failure. Schedule Hrs 01 Lv Marfac, transit to ABOF site Hrs 35 Arr ABOF, survey and deploy Hrs 37 Lv ABOF site hrs 72 Arr Marfac Personnel Paul J. Harvey Chief Scientist Thomas Brauchla Development Engineer Daniel Jackson Marine Technician John Lyons Development Technician Shannon Scott Marine Technician TBN Resident Technician Load List Loading and scientific preparation will require several hours. ITEM Size (h x w x l, ft.) Wt (lbs) 1 surface buoy 6x5x5 1800 1 wire basket 3x4x4 2800 1 anchor 3x4x4 2800 1 spool wire rope 4x4x5 700 10 instruments 3x4x8 600 1 Misc supplies 1000 Total weight 10,700 lbs Loading and Prep Install trash drum on O-1 trawl winch with 200-500 feet of 9/16" 3x19 wire. Set up deck capstan. Load scientific gear on deck, tie down. Hang mooring block and stopper chain from A-frame. Load trawl winch with mooring. Paul J. Harvey Center for Coastal Studies Scripps Institution of Oceanography TEL 619-534-4540 FAX 619-534-8299