4. Installations and Equipment
Details of installations and equipment (type, specification; dates of laying, servicing, recovery; exact locations and depth): ADCPs and bottom pressure gauges, housed in trawl-resistant bottom mounts, will be placed on the sea floor for a period of about one year. They will be deployed, serviced and recovered during the three respective cruises noted in section 2.2 above. The attached map gives locations and depths.
5. Geographical Areas
5.1 Indicate geographical areas in which the project is to be conducted (with reference in latitude and longitude): All cruises will be in Tsushima Strait, within the bounds 33.0 - 35.5 N, 128 - 131 E. See the attached map. In addition to the area indicated on the chart we request continuous collection of SeaBeam multibeam bathymetry and magnetics port to port.