UNOLS Ship Time Request Form - Section ONE
===============================================================================
UNOLS Request ID #: 19980826143816
Version #: 003
Valid as of: 11/06/98 03:35 PM EST
===============================================================================
P.I. Name Last: Perkins First: Henry MI.: T
===============================================================================
Institution Naval Research Laboratory Reasearch vessel required for:
Address: NRL, Code 7332 _ Ancillary Only
Stennis Space Center, MS 39529 X Principal Use
_ No Ship Required
===============================================================================
Phone: 228-699-5907 Fax: 228-688-5997 E-mail: hperkins@nrlssc.navy.mil
===============================================================================
Co P.I. Name Institution Co P.I. Name Institution
------------ ----------- ------------ -----------
===============================================================================
Title: Bottom Mounted ADCPs in Korea/Tsushima Strait for NRL LINKS Project
===============================================================================
Large Program Name: Other Research Purpose: Physical Oceanography
If Other, specify: NRL LINKS and ONR JES If Other, Specify:
===============================================================================
New Proposal? Y Agency Submitted to: Foreign EEZ? Y
Institution Proposal #: NRL Japan, Korea
N/A Amount Requested: Area(s) of Operation:
Agency Proposal #: TBD NP7A
Lat/Long:
Renewal? Start Date: 10/01/98 Begin: 35N 129E
Grant #: End Date: 09/30/01 End: 35N 129E
===============================================================================
Ship(s) Requested # Science
Year (Name or Size) Days Req. Optimum Dates Alternate Dates
---- ----------------- --------- ------------- ---------------
1999 Roger Revelle 11 05/05/99
1999 Roger Revelle 14 10/03/99
2000 Roger Revelle 16 05/05/00 04/05/00
===============================================================================
--------------- PORTS ------------
Total Science Days: 47 Start: Intermediate: End:
# in Science Party: 12 Pusan None Pusan
===============================================================================
Equipment Required:
_ Vans X P-Code GPS _ MCS _ Alvin _ AMS 120
_ Dynamic Positioning X Multibeam _ SCS _ ROV _ 680 Cond.
===============================================================================
Other Special Equipment; Comments:
----------------------------------
1) Will lower to the bottom and leave there instruments weighing 1800 lbs in air.
One-conductor cable required for water depths up to 150 m. Prefer to use telescoping
beam for launch to minimize ship motion.
2) Recovery of similar instruments will be from fantail. Conducting cable not
required for this.
3) May have own ROV on board during final two cruises.
4) One day is required at beginning and end of each cruise for loading/offloading;
that is, total days required for the three cruises are 13, 16 and 18, respectively.
===============================================================================