UNOLS Ship Time Request Form - Section TWO
===============================================================================
P.I. Name Last: Perkins First: Henry MI.: T
===============================================================================
Other Scientists Involved in Multi-P.I. Program:
------------------------------------------------
Name Institution Phone E-mail
---- ----------- ----- ------
===============================================================================
Are there special considerations of the science party or cruise scheduling?
Consider science time constraints; coordination of equipment shipping;
two-ship operations; weather windows; mooring turn-around; teaching schedules
and others that will affect scheduling decisions.
-------------------------------------------------
===============================================================================
SCUBA Diving? X No _ Yes -- Designate Lead Institution:
# Individual dives: # Divers on board:
A list of all divers and their certification information must be submitted
to the ship's marine superintendent.
===============================================================================
Special Science Party Considerations
X Foreign Nationals _ Medical Conditions _ Disabled Persons _ Other
Please explain:
---------------
Two or three Korean nationals expected
One or two Japanese nationals possible
===============================================================================
Use of Hazardous Materials? X No _ Yes
If Yes, List type, quantity, and disposal plans:
-------------------------------------------------------------------------------
Radioactive? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Explosives? Type: Quantity:
Disposal Plan:
--------------
-------------------------------------------------------------------------------
Other? Type: Quantity:
Disposal Plan:
--------------
===============================================================================
Have you read the RVOC Safety Training Manual-Chapter 1? _ No X Yes
===============================================================================
Technician Required (CTD, SCS, MSC, etc): CTD
===============================================================================
Equipment to be used:
-------------------------------------------------------------------------------
Winches: Wire: Conductor Navigation: Communication:
_ Dredge/Trawl Mechanical X 0.680" X GPS _ Inmarsat
X Hydro _ 9/16" _ 0.322" _ DGPS _ ATS
X CTD _ 1/2" _ .225" _ Loran _ FAX
X Capstans _ 1/4" X Single X Dynamic Positioning _ Cellular
_ Multi _ Other _ SEANET
-------------------------------------------------------------------------------
_ 12 kHz Echosounder X Multibeam Sounder _ Air Compressor
_ 3.5 kHz Echosounder _ Magnetometer
-------------------------------------------------------------------------------
Vans: Nets:
_ Pingers _ Refrigerated _ Dip net
_ Gravity Corers _ Magazine _ Plankton
_ Piston Corers _ Isotope Isolation _ Neuston
_ Box Corers _ Lab _ Bongo
_ Rock Dredges _ Storage _ Mid-water trawl
_ Airgun/watergun system _ Berthing _ MOCNESS
_ Explosive Handling Gear _ Chest Freezers (Size):
X Thermometers _ Refrigerators X Work boats
X CTD X Computer/peripherals
X Rosette Sys. _ Auto Analyzer X PC computers
X Niskin bottles X Salinometer _ SAIL system
Size: 1 liter _ Oxygen titration X ADCP
and number: 5 _ Liquid Scintillation _ Gravimeter
_ Uncontaminated seawater X IMET
===============================================================================
Other Special Equipment; Equipment Requiring Special Handling, Storage or
Installation; Comments:
-----------------------
1) Will lower to the bottom and leave there instruments weighing 1800 lbs in air.
One-conductor cable required for water depths up to 150 m. Prefer to use telescoping
beam for launch to minimize ship motion.
2) Recovery of similar instruments will be from fantail. Conducting cable not
required for this.
3) May have own ROV on board during final two cruises.
4) One day is required at beginning and end of each cruise for loading/offloading;
that is, total days required for the three cruises are 13, 16 and 18, respectively.
===============================================================================