|
DATE SENT |
DOCUMENTS SENT |
|
4/18/00 |
Check-off list |
|
6/21/00 |
Pre-cruise letter w/forms |
|
|
Radioisotope form |
|
6/26/00 |
Chief Scientist letter |
|
9/14/00 |
Post-cruise letter w/forms |
|
|
Foreign clearance package* |
************************** ODF ***************************** ************************** EQUIPMENT REQUEST ***************************** -------------- PI/REQUESTOR: Fred Spiess ODF REFERENCE NAME: 07RR.spiess Scripps Institution of Oceanography MPL La Jolla, CA 92037-0205 INDEX: ODF use STS1165(Spiess) Ph: 858-534-1621 NSF Funds Fax:858-534-6849 fns@mpl.ucsd.edu SHIP: REVELLE STS/ODF TIC: Carl Mattson (Staging Only) DATES: 14 July 2000 - 25 July - 11 August 2000 PORT(s): San Diego to Astoria to Astoria, OR __________________________________________________________________________ STS/ODF PERSONNEL REQUIRED: No: 0 __________________________________________________________________________ Casts: 48 Salinity Samples to be analyzed ashore Equipment Required: CTD SBE system with acquisition computer, SeaBird programs: SeaBird SEASAVE for Windows SeaBird Data Processing programs DOS based. SeaBird Data Processing Manual SeaBird Data Acquisition Manual Calibration to be performed pre-cruise Post-Cruise calibrations will be performed after 16 December 2000 CTD 9+ 6800M Press Digiquartz Primary Sensors Temp SBE 3plus Cond SBE 4C Pump SBE 5T Secondary Sensors Temp SBE 3-01/F Cond SBE 4-02/O Pump2 SBE 5T Deck unit 11plus Spare Sensors Temp SBE 3-01/F Cond SBE 4-02/O 12 place rosette 12 each bottle (3l) Pylon, 12-place General Oceanics 1015 2 cases salt bottles, 24/case Forms for Salinity samples __________________________________________________________________________ Additional Information: http://sio.ucsd.edu/supp_groups/shipsked/2000/index.html CTD and rosette to be left on board for subsequent expeditions. Requestor to make arrangements to ship Salinity samples back to STS/ODF. Loading Details (Approx.Dates,etc.): Loaded in San Diego All equipment is to be returned clean and assembled. Overboard equipment must be rinsed with fresh water and dried. Taken by: W. Sutherland Request by:K. Sanborn, 14 June 2000 Copies to: Sutherland/Ayers/Digre/Asch/Files(Administration), Williams/Rusk(Marine Tech), Masten(Chemistry), Delahoyde/Johnson(Computer), Patrick(Thermometry, CTD Calibs), Mattson/Schmitt(Electronics), Long(Logistics), Swift(Science), Requestor/PI Resident Technicians (restech@sdsioa.ucsd.edu), Ship Scheduling (shipsked@ucsd.edu) ODF participants: None ** Notify Carl Mattson or Kristin Sanborn of additions or changes to CTD or salinity sampling. internet: ksanborn@ucsd.edu Telephone: (858) 534-1903 cmattson@ucsd.edu (858) 534-1907 Equipment has been received. |Equipment has been returned. |(Please annotate equipment |condition) | | | X_________________________ |X_________________________________ Signature of Requestor/PI |Signature of ODF technician
X-Sender: fns@turbo.ucsd.edu Date: Wed, 26 Jan 2000 10:24:07 -0800 To: Rose Dufour <rdufour@ucsd.edu>, Elizabeth Brenner <ebrenner@ucsd.edu>, shipsked@ucsd.edu From: fns@mpl.ucsd.edu (F. N. Spiess) Subject: Re: Revelle Schedule Cc: Chris de Moustier <cpm@mpl.ucsd.edu> Rose: To keep you up to date on the scheduling reactions. Fred. From: "Davis, Earl" <davis@pgc-gsc.nrcan.gc.ca> To: "'Spiess, Fred'" <fns@mpl.ucsd.edu> Cc: Keir Becker <kbecker@rsmas.miami.edu>, cdc@mpl.ucsd.edu, John Hildebrand <jah@mpl.ucsd.edu>, Chris de Moustier <cpm@mpl.ucsd.edu>, "'Macdonald, Bob'" <macdonald@pgc.nrcan.gc.ca> Subject: RE: Revelle Schedule Date: Tue, 25 Jan 2000 15:36:02 -0800 MIME-Version: 1.0 Fred- I don't have a problem with the schedule, but Bob Macdonald may; I believe he is going to sea on Tully on July 10 or 12. It was going to be tight before; the new time creates a conflict. He is not in this afternoon; I will check with him tomorrow. Earl
>X-Sender: becker@umigw.miami.edu >Mime-Version: 1.0 >Date: Wed, 26 Jan 2000 08:59:48 -0500 >To: fns@mpl.ucsd.edu (F. N. Spiess), davis@pgc-gsc.nrcan.gc.ca >From: Keir Becker <kbecker@rsmas.miami.edu> >Subject: Re: Revelle Schedule >Cc: cdc@mpl.ucsd.edu, jah@mpl.ucsd.edu, cpm@mpl.ucsd.edu > >Hello Fred and Earl - > >Delaying the test cruise a few days is OK for the Miami people. But I hope >Bob Macdonald's conflict can be worked out -- he is very important if not >essential to our effort. > >I was concerned whether the few-day delay would cascade to our 2001 >deployment cruise, but on checking the new schedule (already posted on the >SIO site), it appears the deployment cruise dates have been preserved. But >I noticed new notation about the ending port call -- apparently it may be >changed into a personnel-offload only, at some Middle American port to be >determined based on what programs are funded afterward. I realize your >group is heavily involved with the subsequent programs and can probably >leave all your gear aboard. But we will be bringing Earl's heavy heat flow >gear, which will need to be offloaded and returned from a reliable port >sooner or later. > >Earl -- how urgent is the return of the HF gear? What flexibility is there >to wait a few months? I'm prepared to alert SIO ship scheduling if there's >an issue... > >Cheers, >Keir >