![]() |
![]() |
|||||||
|
|
||||||||
| Ship Operations >> Schedules >> Sproul >> Chief Scientist >> Cruise Plan |
| Cruise Plan |
Captain Althouse,
We propose to arrive at MarFac and load all equipment the morning of
the 19th (~8:30am) and subsequently will plan for a 10:00am departure.
We also plan to return to MarFac that evening (likely after dinner). We're going to use the trawl wire while on station during the deployment
phase to test acoustics, which should take no longer than an hour in the
water. We'll lower it about ~900 meters. The general deployment location
for instruments will be: Following the trawl wire ops, we will then deploy the lone OBS instrument,
then acoustically survey using the hull ducer. All instruments will stay
down until an Oct 10 recovery aboard Sproul. -jeff |
| Scripps Home | SOMTS Home | Ship Tech Support | Contacts | Schedules | Marine Facility | Site Map |
|
Ship Scheduling
9500 Gilman Drive, La Jolla, CA 92093-0210 Telephone: (858) 534-2840 Fax: (858) 822-5811 shipsked@ucsd.edu |
||||||